01 / Formation

Set out the route and establish the working profile. Excavation, fill placement and grading create the geometry on which subsequent pavement layers depend.

02 / Compaction

Control layer preparation and compaction in relation to the specified material. The equipment sequence links placement, moisture conditions and surface consistency.

03 / Surfacing

Coordinate material supply, paving and rolling so the work proceeds across planned fronts. Joints, edges and transitions deserve the same attention as the main running surface.

04 / Interfaces

Consider existing access points, road edges and adjacent services. A completed road must fit the routes and spaces around it as well as meet its own construction requirements.